CPA VIETNAM AUDITING COMPANY LIMITED
Qualified services, global understanding and vision

GROUND-BREAKING CEREMONY FOR IDICO TAN PHUOC 1 INDUSTRIAL PARK MARKS THE LAUNCH OF IDICO’S COMPREHENSIVE INVESTMENT STRATEGY IN THE MEKONG DELTA

22/09/2026 - 10:21      14 view
Dong Thap, September 17, 2026 – IDICO Tien Giang Joint Stock Company, a subsidiary of IDICO Corporation – JSC (HNX: IDC), officially held the Ground-Breaking Ceremony for the construction of technical infrastructure for IDICO Tan Phuoc 1 Industrial Park, a 470-hectare project located in Dong Thap Province – a gateway connecting the Mekong Delta with Ho Chi Minh City.
Nội dung chính[ẩn][hiện]

LỄ ĐỘNG THỔ.png

Images from the Ground-Breaking Ceremony for the Construction of Technical Infrastructure of IDICO Tan Phuoc 1 Industrial Park

On the same day, the Conference on Introduction and Investment Promotion for IDICO Tan Phuoc 1 Industrial Park was held with the participation of leaders of Dong Thap Province, representatives of relevant authorities and associations, as well as numerous domestic and foreign enterprises seeking investment opportunities in the project. Five memoranda of understanding and cooperation agreements covering a total area of 41 hectares were signed at the Conference, marking the first investment connections and demonstrating the business community’s interest in the new industrial space in Tan Phuoc.

ÔNG NGUYỄN THÀNH DIỆU, TỈNH ỦY VIÊN, PHÓ CHỦ TỊCH UBND TỈNH ĐỒNG THÁP(1).png

Mr. Nguyen Thanh Dieu – Member of the Dong Thap Provincial Party Committee and Vice Chairman of the Dong Thap Provincial People’s Committee, delivering his remarks at the Conference on Introduction and Investment Promotion for IDICO Tan Phuoc 1 Industrial Park

IDICO Tan Phuoc 1 is expected to begin welcoming investors from the first quarter of 2027. Once fully occupied and operating stably, the project is expected to attract approximately USD 1.5 billion in total investment capital and create jobs for around 20,000 workers.

FROM THE GATEWAY TO THE MEKONG DELTA TO AN INTEGRATED CONSUMER MANUFACTURING HUB

Located at the gateway to the Mekong Delta, IDICO Tan Phuoc 1 Industrial Park is oriented toward developing an integrated consumer manufacturing ecosystem, leveraging the region’s advantages in transportation connectivity, logistics, markets and raw material sources in Dong Thap.

In terms of connectivity, IDICO Tan Phuoc 1 is only approximately 3 km from an interchange connecting to the Ho Chi Minh City – Trung Luong – My Thuan – Can Tho Expressway, providing links to Ho Chi Minh City and major economic centers in the Mekong Delta. It also connects with the Ben Luc – Long Thanh Expressway, expanding access to Long Thanh International Airport and the Cai Mep – Thi Vai port complex. The inland waterway port system within the industrial park also supports multimodal transportation and connects with the region’s river and maritime transport networks.

Its advantageous location and connectivity enable IDICO Tan Phuoc 1 Industrial Park to leverage the Mekong Delta’s raw material advantages and develop food manufacturing and processing industries associated with the region’s abundant agricultural and aquatic resources. At the same time, its capacity to accommodate textile and garment projects involving dyeing processes will facilitate the development of additional links in the supply chain, contributing to greater localization of production in the locality.

Map tan phuoc co logoo.png

Connectivity map of IDICO Tan Phuoc 1 Industrial Park

INTEGRATED INFRASTRUCTURE TOWARD A SUSTAINABLE INDUSTRIAL ECOSYSTEM

Technical infrastructure and essential services at IDICO Tan Phuoc 1 Industrial Park will be directly operated by the developer, including a water supply plant, a wastewater treatment system meeting Column A standards, and a 110kV substation. These facilities will contribute to maintaining service stability and quality control throughout enterprises’ operations within the industrial park.

Technological solutions are also integrated into the operation of the industrial park, including the application of AI in environmental monitoring and security surveillance, enhancing the ability to monitor, issue alerts and control activities within the industrial park.

In addition to production infrastructure, IDICO has planned accommodation facilities for experts and workers within the industrial park, together with a social housing development of approximately 20 hectares adjacent to IDICO Tan Phuoc 1 Industrial Park. These facilities provide practical conditions for attracting and retaining human resources – a foundation for the sustainable development of businesses, the community and the local area.

This orientation is also consistent with the perspective shared by Mr. Nguyen Thanh Dieu – Member of the Dong Thap Provincial Party Committee and Vice Chairman of the Dong Thap Provincial People’s Committee – at the Conference, emphasizing that industrial development should not stop at providing infrastructure for lease, but should aim to establish a high-quality, green and sustainable production ecosystem with high added value.

5 MEMORANDA OF UNDERSTANDING – THE FIRST INVESTMENT CONNECTIONS ESTABLISHED

A highlight of the Conference on Introduction and Investment Promotion for IDICO Tan Phuoc 1 Industrial Park was the interest shown by domestic and foreign associations and enterprises in the project.

Five memoranda of understanding covering a total area of 41 hectares were signed between IDICO Tien Giang Joint Stock Company and the Dong Thap Provincial Business Association, Anh Duong Building Joint Stock Company, Zhongbo Construction Engineering Group (Vietnam) Co., Ltd. (a member of China’s Greenland Group), IDEC GROUP ASIA PTE. LTD. (a member of France’s IDEC GROUP), and IDICO-URBIZ One Member Company Limited. These agreements mark initial cooperation toward the development orientation of IDICO Tan Phuoc 1 Industrial Park.

KÝ KẾT HIỆP HỘI DOANH NGHIỆP TỈNH ĐỒNG THÁP.png

KÝ KẾT ADB.png

KY KET GREENLAND.png

KY KET IDEC.png

KÝ KẾT CÔNG TY TNHH MTV IDICO-URBIZ.png

Signing of investment cooperation memoranda as part of the Conference

THE BEGINNING OF IDICO’S LONG-TERM STRATEGY IN THE MEKONG DELTA

IDICO Tan Phuoc 1 Industrial Park is one of the projects within IDICO’s strategy to expand its industrial ecosystem in localities with strong development potential.

With more than 25 years of experience in developing industrial ecosystems, IDICO currently invests in and manages 14 industrial parks across key economic regions nationwide. Building on this foundation, IDICO aims to develop IDICO Tan Phuoc 1 Industrial Park not merely as an infrastructure project, but as a step toward establishing a comprehensive industrial ecosystem in Dong Thap, encompassing infrastructure, operational services, housing and connections with the local workforce.

ÔNG NGUYỄN HỒNG HẢI – PHÓ TỔNG GIÁM ĐỐC TỔNG CÔNG TY IDICO, GIÁM ĐỐC CTCP IDICO TIỀN GIANG.png

“IDICO is ready to continue accompanying Dong Thap Province, studying and participating in suitable projects and gradually contributing to the formation of a key industrial area in Tan Phuoc.” – Mr. Nguyen Hong Hai, Deputy General Director of IDICO Corporation and Director of IDICO Tien Giang Joint Stock Company."

03/10/2026 4
On the morning of September 29, 2026, the Party Committee and all members of the Party Cell of the Geology and Minerals Joint Stock Company attended an online conference to disseminate and implement a number of Resolutions and Directives of the Politburo, organized by the Party Committee of Nhieu Loc Ward under the Ho Chi Minh City Party Committee.
View details
02/10/2026 5
Off-budget investment projects are projects financed entirely by enterprises, private investors or commercial loans, without using funds from the State budget.
View details
02/10/2026 4
On September 22, 2026, in New York, USA, a delegation from the Vietnam National Coal and Mineral Industries Group (Vinacomin), led by Chairman of the Members' Council Ngo Hoang Ngan, held a working session with senior executives of Caterpillar, the U.S.-based multinational corporation and the world's largest manufacturer of construction and mining equipment.
View details
01/10/2026 9
A total of 612 social housing units at the Minh Duc Residential Area Project in Me Linh Commune, Hanoi, are expected to be offered for sale, lease, and lease-purchase from October 24. The starting sale price is VND 23.9 million/m².
View details
30/09/2026 38
Fuel prices today, September 30, 2026: Global crude oil prices fell sharply from the previous day, while domestic retail prices remained at the levels set in the September 24 price adjustment and await the next adjustment scheduled for the afternoon of October 1.
View details
30/09/2026 9
In the early hours of September 26, train SE4 arrived at Hanoi Railway Station, carrying the remains of martyr Vi Ngoc Vinh from Ho Chi Minh City back to his hometown in Phu Tho, more than 50 years after he was laid to rest in the southern region.
View details
29/09/2026 15
VNR proposes that the Ministry of Construction continue studying an option to organize the national railway network in a radial pattern, with the national railway system, particularly the high-speed railway, directly connected to central Hanoi.
View details
29/09/2026 11
On the afternoon of September 27, in Thong Nhat Ward, Gia Lai Province, a working delegation from Military Region 5, led by Major General Phan Dai Nghia, Deputy Commander and Chief of Staff, inspected preparations for receiving students for the 2026–2027 academic year at Branch 1 of the Central Military Boarding School.
View details
28/09/2026 19
Vietnam National Railways Group has proposed further studying the option of bringing the national railway system, particularly the high-speed railway, into central Hanoi, instead of limiting passenger boarding and alighting to railway hubs located on the outskirts of the city.
View details
26/09/2026 34
Hanoi, September 24, 2026 – Vietnam National Petroleum Group (Petrolimex/the Group – stock code: PLX) officially adjusted its fuel prices, with the new prices as follows:
View details
Head Office
Representative Office
Northern Branch
Ho Chi Minh City Branch
Key thời gian làm việc
Copyright © 2026 CPA VIETNAM AUDIT. All rights reserved. Website designed by Tat Thanh
Access statistics
Total visits: 487958 Currently visiting: 325
Website Policy