CPA VIETNAM AUDITING COMPANY LIMITED
Qualified services, global understanding and vision

Ninh Binh approves $44.5 million GMP medical manufacturing plant

09/10/2026 - 08:54      38 view
The facility aims to build a GMP-certified complex producing human pharmaceuticals, functional foods, cosmetics, medical equipment, and medical supplies.
Nội dung chính[ẩn][hiện]

Ninh Binh approves $44.5 million GMP medical manufacturing plant

A production line of an EU-GMP pharmaceutical factory. (Photo: GMPC Vietnam)

The People's Committee of northern Ninh Binh Province has approved investment adjustments for a VND1.17 trillion ($44.5 million) GMP-certified manufacturing plant producing pharmaceuticals, functional foods, cosmetics, and medical devices at Kim Binh Industrial Cluster over a 60-month timeline.

Under Decision 3619/QD-UBND of the Committee, the project will be developed by EMJ Ha Nam Joint Stock Company. Equity contributed by the investor accounts for over VND421 billion ($16 million), or approximately 36 percent of total capital, while the remaining VND750 billion ($28.5 million) will be raised through credit institutions in Vietnam.

The facility aims to build a GMP-certified complex producing human pharmaceuticals, functional foods, cosmetics, medical equipment, and medical supplies.

Under the approved capacity, the plant is designed to manufacture approximately 1.25 million boxes of pharmaceuticals and 700,000 boxes of functional foods annually. Annual output for cosmetics is targeted at 850,000 to 1.1 million boxes, while consumable medical devices and basic supplies will reach 250,000 to 500,000 boxes per year.

The project will be executed across 60 months from October 2026 to September 2031. During the initial 24 months, the developer will construct Phase 1, comprising one manufacturing workshop, a wastewater treatment station, and related technical infrastructure.

From the 25th to the 35th month, the investor will initiate commercial operations for completed items meeting operational criteria. Phase 2 will run from the 36th to the 60th month, focusing on completing remaining facilities and bringing the entire complex into full operation.

Ninh Binh provincial authorities mandated strict compliance with environmental protection regulations. All wastewater must be collected and treated to meet Column A standards under QCVN 40:2025/BTNMT (National Technical Regulation on Industrial Wastewater in Vietnam, issued under Circular 06/2025/TT-BTNMT of the Ministry of Agriculture and Environment) before discharge into the environment.

The Ninh Binh Provincial Department of Agriculture and Environment was tasked with monitoring environmental compliance. In the event of discharge violations, the investor must immediately suspend operations, bear remediation costs, and pay compensation in accordance with law.

21/10/2026 5
Deploying AI aims to shift traffic management from a reactive posture—responding only after bottlenecks have formed—to a data-driven approach that detects risks early and enables proactive regulation.
View details
21/10/2026 5
Addressing the forum, the top Vietnamese leader stressed that Vietnam seeks not only investment capital but also advanced technologies, expertise, modern management practices, research and development (R&D), high-quality human resources and stronger links between foreign investors and domestic businesses.
View details
21/10/2026 7
Financing is co-funded by a consortium of four leading domestic commercial banks: Vietcombank, VietinBank, BIDV, and Agribank.
View details
20/10/2026 5
The project area is located in the nearshore sea, within a 6-nautical-mile range, covering Bac Gianh Ward, Dong Trach Commune, and Hoan Lao Commune in Quang Tri Province.
View details
20/10/2026 6
The program aims to advise and support 50,000 women-owned or women-managed businesses in accessing finance.
View details
20/10/2026 7
The project will build technical infrastructure systems, including ground leveling, transport roads, rainwater and wastewater drainage, a wastewater treatment station, power supply, public lighting, multi-utility service trenches, and green parks.
View details
19/10/2026 6
Under the new strategy, the foreign debt-to-GDP ratio represents a five-percent increase from the previous edition of the public debt strategy through 2030 which had been adopted by the Government in 2022.
View details
19/10/2026 6
Deputy Prime Minister Nguyen Van Thang urged the central bank to execute timely, substantive measures to bring down overall interest rate levels, specifically targeting a 1.5–2% cut in loan rates for production, commerce, and priority sectors.
View details
19/10/2026 8
The move is part of efforts to maintain macroeconomic stability, control inflation and support economic growth.
View details
16/10/2026 15
The technology conglomerate expects facilities like Digital Technology Building No. 1 to gradually transform the Tay Tuu–Phu Dien area into a technology valley that attracts top talent, fosters education and research, advances domestic and international partnerships, convenes technology firms, and incubates novel tech products.
View details
16/10/2026 11
A central initiative of the campaign is standardizing the brand identity guidelines for “Vibrant Ho Chi Minh City” to ensure consistency across government bodies, tourism enterprises, and partners.
View details
16/10/2026 15
Vietnam issuing USD-denominated government bonds would be entirely feasible given that certain preparatory stages for an international bond issuance are already underway.
View details
Head Office
Representative Office
Northern Branch
Ho Chi Minh City Branch
Key thời gian làm việc
Copyright © 2026 CPA VIETNAM AUDIT. All rights reserved. Website designed by Tat Thanh
Access statistics
Total visits: 487958 Currently visiting: 325
Website Policy